To animate the Banner
Procurement Tender
Bidding Project for Chemicals (Sodium Hypochlorite, Sodium Hydroxide, Hydrochloric Acid) in June and July 2021
2021年10月28日 08:00
Name
Last update time
Size
-
2023-11-17 11:26:55.486
18.5KB
1. Procurement technical requirements(The substantive requirements and conditions that do not allow deviation are indicated in bold and italics)
2. The scope of this procurement includes the supply, transportation, installation, maintenance, personnel training and after-sales service of goods.
3, the project procurement budget amount.: RMB seven hundred and ninety thousand yuan only (¥790000.00 yuan). If the final response quotation is higher than the purchase budget or ceiling price, it will be judged as invalid response document. The maximum price of this project is 90% of the purchase budget amount. Except for special requirements, the configuration of the above purchased goods must be provided in accordance with standard functions and parameters. The products supplied must be brand new and qualified genuine goods, and the manufacturer must issue a product warranty. For imported products, relevant certificates must be provided and must meet the requirements of national environmental protection and relevant quality standards.
4. Quality requirements of goods
Meet the requirements of the Sanitary Standard for Drinking Water (GB5750-2006). The consumption reagent of the online instrument shall be able to be used in conjunction with the instrument, and the standard sample and the consumption reagent of the online instrument shall be supplied as required to ensure that the expiration date is not exceeded. All drugs and standard samples must meet the requirements of the double random assessment of Jiangsu Province and the assessment and evaluation index system of urban water supply security in Jiangsu Province. All standards and environmental standards in Tables 1-3 and 1-4 shall meet the criteria in the remarks.
The manufacturer of the standard solution provided shall have the national standard substance grading certificate and the standard substance/standard sample producer approval certificate. The transportation of chemical reagents and consumables must comply with relevant national laws and regulations and industry standards.
5. After-sales service requirements
(1) The equipment is guaranteed free of charge for 1 year from the date of acceptance. During the warranty period, Party B shall implement three guarantees for product quality. In case of failure caused by equipment configuration or manufacturing quality problems, Party B shall immediately repair or replace it free of charge within 24 hours, and all expenses arising therefrom shall be borne by Party B.
(2) Technical support response time. General problems shall be supported by telephone within 2 hours, and difficult and key problems shall be solved on site within 2 days. Party B shall bear the relevant expenses during the warranty period, and Party B shall charge the cost after the expiration of the warranty period.
In addition to the service requirements specified in this document, the after-sales service that the supplier can promise shall be specified in detail, and the supplier shall be responsible for providing equipment maintenance or operator training to the purchaser free of charge. The repair response time is the normal time of the journey plus 3 hours.
6. Delivery time and place
(1) In order to facilitate the purchaser to organize production, the delivery time of all goods shall be determined after consultation, if necessary, in batches, the supplier must promise a reasonable delivery time, in each batch of orders confirmed by both parties within 2 days of delivery, delayed delivery will be subject to certain economic penalties.
(2) Place of delivery: The goods shall be delivered and unloaded by the supplier to the place designated by the purchaser, and the relevant information (certificate of conformity, test report, etc.) shall be complete. The goods shall be inspected by relevant personnel organized by the purchaser, and those who fail the inspection shall be returned, and all losses caused thereby shall be borne by the supplier.
7. Payment Method
Each batch of goods supplied by the site after the initial inspection of storage, to be used for 10 days without quality problems found in a one-time payment.